Skip to content

On-Site Deployment of 3D Construction Printing for the Building a Two-Story Building in China (2024-09)

10.24355/dbbs.084-202408131322-0

Lin Xiqiang, Huo Liang, Li Guoyou,  Wang Hailong,  Xia Ming,  Sun Xiaoyan
Contribution - Supplementary Proceedings of the 4th RILEM International Conference on Concrete and Digital Fabrication

Abstract

In the evolving field of construction technology, 3D construction printing (3DCP) has advanced from small-scale experiments to large-scale projects, involving complex steps and challenges. This paper summarizes the technologies used in the first on-site 3D printing of a two-story office building in China, covering 230 m² with a total printing time of 49.5 hours. It highlights the development of a large-scale, modular, and high-precision 3D printer capable of performing various construction tasks. A specialized additive, crucial for creating a suitable printable mix was developed, demonstrating excellent performance characteristics. The research addressed the challenge of integrating vertical reinforcements in 3D-printed structures, particularly at intersections with the foundation. Advanced material technology and automatic spray curing methods were integrated to mitigate shrinkage and cracking issues in Portland cement-based printing materials. The successful printing of the two-story office building confirms the feasibility of digital construction technology in 3D concrete printing, marking a significant advancement in construction methodologies.

BibTeX
@inproceedings{lin_huo_li_wang.2024.OSDo3CPftBaTSBiC,
  author            = "Xiqiang Lin and Liang Huo and Guoyou Li and Hailong Wang and Ming Xia and Xiaoyan Sun",
  title             = "On-Site Deployment of 3D Construction Printing for the Building a Two-Story Building in China",
  doi               = "10.24355/dbbs.084-202408131322-0",
  year              = "2024",
  booktitle         = "Supplementary Proceedings of the 4th RILEM International Conference on Concrete and Digital Fabrication",
  editor            = "Dirk Lowke and Niklas Freund and David Böhler and Friedrich Herding",
}
Formatted Citation

X. Lin, L. Huo, G. Li, H. Wang, M. Xia and X. Sun, “On-Site Deployment of 3D Construction Printing for the Building a Two-Story Building in China”, in Supplementary Proceedings of the 4th RILEM International Conference on Concrete and Digital Fabrication, 2024. doi: 10.24355/dbbs.084-202408131322-0.

Lin, Xiqiang, Liang Huo, Guoyou Li, Hailong Wang, Ming Xia, and Xiaoyan Sun. “On-Site Deployment of 3D Construction Printing for the Building a Two-Story Building in China”. In Supplementary Proceedings of the 4th RILEM International Conference on Concrete and Digital Fabrication, edited by Dirk Lowke, Niklas Freund, David Böhler, and Friedrich Herding, 2024. https://doi.org/10.24355/dbbs.084-202408131322-0.